Time To Template
Templating the toilet! Obviously we have already had the most important parts ready to go for a while now… Water supply and the waste pipe (covered with plastic/ duct tape): […]
Templating the toilet! Obviously we have already had the most important parts ready to go for a while now… Water supply and the waste pipe (covered with plastic/ duct tape): […]
Our bathroom threshold is a week away from a brand new marble threshold, and needs some attention. Before we ransacked the bathroom it had a large 2.5″ or so high […]
Staining to match existing is tricky business. Tonight we tried our hand at it, with pretty perfect results (and a lil bit of frustration mixed in for good measure). Here […]
Threshold, post-stain/ pre-poly: Post-poly, first coat: After a light sanding, we’ll apply another coat, then sand, then a final coat. Then, marble threshold!
A shower so sweet, we installed two. (Okay yes so that was always in the plan) Here’s the scoop on the second ‘south’ shower… Suspiciously similar to the ‘north’ shower: […]
You may have heard, we’ve moved our shower facilities to the second floor! Here’s some squeaky clean details on our modern spa Victorian shower. > “Exposed Twin Thermostatic Shower Valve, […]