Library/ Office/ Hang Space

What we’ve done so far:

Add new insulation, added new a/c & heat (third floor on it’s own zone) by  installing a unit in the ceiling and running ductwork in the mini-attic, scrubbed & repainted all the radiators, repainted all the walls, ceiling, wainscot; replaced the wood sills with marble sills, started to create a built in AV cabinet, wired new intercom system, installed new recessed lights at bookcase, replaced all electrical, added switched receptacles,  installed some top secret conduit for our future tv, patched plaster… basically the works

What we plan to do:

Refinish the wood floors, do some touch up on the bookcases so the glass doors shut all the way, furnish the place (ie new couch, tv, rug, curtains), finalize the book locations.

Here are some before shots, as well as some “progress”:

This slideshow requires JavaScript.

We'd love to hear from you!

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s