Plumbing It Up
Wonder what this will do in our new bathroom? Or what’s going on over here? The left and right valves are the hot & cold levers, the middle is for […]
Wonder what this will do in our new bathroom? Or what’s going on over here? The left and right valves are the hot & cold levers, the middle is for […]
And useful, eventually. Center of pic is tub filler, to the L & R partially up the wall you’ll notice two sets of rough-ins, one for each shower head control: […]
Valve plumbing is done! Peek thru at the copper and brass: A jumbled mess from top to bottom but really it’s been a productive day… One of the modified drawers, […]
Finished up the second set of shut offs for the shower: So we can see between the first & second floors again! Third and final access panel location (tub drain […]
Before we frame we must figure out a few plumbing details including for the tub filler: Running water on the second floor is going to be pretty sweet!
Grout can make or break a pretty tile job, but there’s not a lot of nice color options out there (we’re using Mapei unsanded). But in order to finish the […]