Let’s get acquainted with the current condition of the room. You may remember this room made a blog cameo in the bathroom project as a tile cutting station.
Entering off the hallway- our work-on-the-house-clothes dresser:
The main event: open storage shelves, high ceiling, and purple carpet:
Came with the house curtains over a large window, a radiator relocated and re-plumbed by us, ladder, mini shop vac and dissasembled shelving:
Turning back around, the door, lower ceiling area with downlights and a glimpse of the storage shelves:
With the door closed:
Now looking up into the new mechanical space we carved out in order to install AC (white outline is where we’ll be covering the space in a manner TBD):
So there’s the “Before” tour!