Deck Progress In The Dark
Tonight we constructed the top of eating area: Soil in planter, and here’s Rob hooking up the aircraft cable… Which will hold up lights, which still need to be ordered… […]
Tonight we constructed the top of eating area: Soil in planter, and here’s Rob hooking up the aircraft cable… Which will hold up lights, which still need to be ordered… […]
With only about 9 hours of work we made some major progress on our little deck: We added some bracing to hold an eating/ drink setting down surface: And crafted […]
The plumber, in action: The final under-sink space, with garbage disposal, instaHot heater, water chiller, h2o filter, drain and supply lines. It was really tough to fit it all in […]
Mix… And pour: Mix and pour: Mix and pour: A little smoothing but mostly mix and pour: Wait 2-3 hours and it’s cured, smoothe and most importantly, LEVEL! And we […]
This morning: The last of the lauan removal took another 4 hours or so, and we had to exchange our main scraping tool (our new dremel multi) at home depot […]
Tonight we finished installing the casing at the back door: …and the rest of the horizontal trim at the top of the tile wainscot. I primed the bookshelf tonight too: […]