The wall furring strips are 90% up. They allow us to level out the existing walls…
The strips behind the future tile wainscot are a bit thicker than the furring strips behind the beadboard to accommodate the differences in finish material. All the tile furring strips are Done:
Although it looks a bit chaotic (and fluffy) we know exactly what we’re doing 🙂