Half Bath Progress

Tonight, some progress on the half bath!

First, build the customized Ikea cabinet that Rob adjusted to the curve of the wall:

Then, mock up the locations of the sink and faucet:

I’m skipping a few steps here, but install the cabinet, and attach sink and faucet:

And now we’re inches away from running water on the first floor:

The foam on the wall was a mockup of the mirror.
Don’t worry the rest of the piping, marble countertop, cabinet doors, final paint and actual mirror are on their way!