Ready For Floor?
Yesterday, we finished nearly everything that needs to be done under the floor before the plywood subfloor goes back down. Rough-ins for the towel warmer: Metal plates on the pex […]
Yesterday, we finished nearly everything that needs to be done under the floor before the plywood subfloor goes back down. Rough-ins for the towel warmer: Metal plates on the pex […]
Cutting the pex to add the lines for the towel warmer: These two copper stubs come off the radiant floor pex we ran way back when, and will run hot […]
… on the second floor again!! This is the test to the new valves: No leaks!
1: cut hole 2: Apply Construction adhesive 3: Clamp! And done!
Finished up the second set of shut offs for the shower: So we can see between the first & second floors again! Third and final access panel location (tub drain […]
Plumbing in action: Working in floor-less conditions is difficult: Look! Valves at the Access panel: Mad skills in action: